{"page":{"id":44,"title":"Cancel or Change an Order","handle":"cancel-change-order","url":"https://koishine.com/cancel-change-order/","body_html":"<p class=\"policy-updated\">Last updated: <time datetime=\"2026-10-22\">October 22, 2026</time></p>\n<p>Personalised keepsakes are made to order, which means the most useful moment to change something is before it is printed or engraved. This page explains the 24-hour window we keep open after every order, what can be changed in it, what happens once making has begun, and how a cancelled order is refunded. If your keepsake has already been delivered, our <a href=\"/returns-exchanges-policy/\">Returns &amp; Exchanges Policy</a> applies instead.</p>\n<section class=\"policy-summary\">\n<h2>Cancelling or changing in brief</h2>\n<ul>\n<li><strong>Free changes or cancellation:</strong> within 24 hours of placing your order, before making starts.</li>\n<li><strong>After 24 hours:</strong> we still try to help until the parcel leaves us, but a piece already made may need to be remade.</li>\n<li><strong>After shipping:</strong> accept the parcel, then return or exchange it within 60 days, with free return postage.</li>\n<li><strong>Refund for a cancelled order:</strong> the full amount, received within 7 calendar days of our confirmation.</li>\n</ul>\n</section>\n<h2>1. The 24-hour correction window</h2>\n<p>Every order rests for 24 hours before we begin making it. We do this on purpose. Names are easy to mistype on a phone, dates are easy to swap between day-first and month-first formats, and a photo chosen in a hurry is sometimes not the one you meant. During those 24 hours you can change or cancel your order free of charge, without giving a reason.</p>\n<p>The window is counted from the time on your order confirmation email, in US Eastern time. A request that reaches us inside the window is honoured even if we reply after it has closed.</p>\n<h2>2. What you can change</h2>\n<ul>\n<li><strong>Personalisation text:</strong> names, dates, a short message, the spelling of a pet&#8217;s name, the order of names on a family piece.</li>\n<li><strong>Photo:</strong> a different photo, a better-quality version of the same photo, or a different crop.</li>\n<li><strong>Options:</strong> photo size, orientation, frame colour, finish or material, where the design offers a choice.</li>\n<li><strong>Quantity and items:</strong> add another piece, remove one, or switch to a different design.</li>\n<li><strong>Delivery details:</strong> the recipient&#8217;s name, the shipping address or the note included in the parcel.</li>\n</ul>\n<p>When a change alters the price, we tell you the new total first. We only charge an increase after you agree, and any decrease is refunded within 7 calendar days.</p>\n<h2>3. How to ask</h2>\n<ol>\n<li>Write to <a href=\"mailto:support@koishine.com\">support@koishine.com</a> or <a href=\"/submit-ticket/\">open a support ticket</a>. Put &#8220;Change&#8221; or &#8220;Cancel&#8221; and your order number in the subject line.</li>\n<li>Say exactly what should change. For text, type it out in full as it should appear, including capital letters and punctuation. For a photo, attach the new file at the largest size you have.</li>\n<li>We confirm in writing within 1 business day. The change is final when you receive that confirmation, and we make your keepsake from the confirmed details.</li>\n</ol>\n<p>If you write in a hurry and realise you made another mistake in the email, simply send a second message. We always work from the latest confirmed version.</p>\n<h2>4. After the window closes</h2>\n<p>Once making has started, the printed acrylic or engraved wood cannot be altered; a change means making the piece again. We still help wherever we can:</p>\n<ul>\n<li><strong>Before the piece is made:</strong> some orders wait slightly longer in the queue. If yours has not reached production, we make the change free of charge, even after 24 hours.</li>\n<li><strong>Made but not yet shipped:</strong> we remake the piece with your correction. If the original was made exactly as ordered, there is no charge for the remake on the first correction; for later requests we explain any cost before going ahead.</li>\n<li><strong>Address change before collection:</strong> free at any point until the carrier collects the parcel.</li>\n</ul>\n<h2>5. If your order has already shipped</h2>\n<p>A parcel in transit cannot be cancelled. Please let it arrive. You then have 60 days from delivery to return it or ask for an exchange, and return postage is free. For an address mistake noticed after shipping, we ask the carrier to redirect the parcel, but the carrier decides whether it can; if the parcel comes back to us, we resend it at no charge once you confirm the correct address. Details are on our <a href=\"/shipping-delivery/\">Shipping &amp; Delivery</a> page.</p>\n<h2>6. Refunds for cancelled orders</h2>\n<p>When we confirm a cancellation, we refund everything you paid for the cancelled items to your original payment method. The money reaches you within 7 calendar days of our confirmation. If you cancel one item from a larger order, only that item is refunded and the rest is made as planned. Our <a href=\"/refund-policy/\">Refund Policy</a> covers refund methods and timing in full.</p>\n<h2>7. When we cancel or pause an order</h2>\n<p>We may need to stop an order in a few situations, and we always tell you by email first:</p>\n<ul>\n<li>The photo is too small, blurred or dark to print well, and we have not heard back after asking for a better file. We wait 7 days and send two reminders before cancelling.</li>\n<li>The personalisation includes material we cannot print, such as content that infringes someone else&#8217;s rights or that is offensive.</li>\n<li>The payment cannot be verified, or the order shows signs of fraud.</li>\n<li>The address is outside the four countries we deliver to, or cannot be delivered to.</li>\n</ul>\n<p>A cancelled order is refunded in full, received within 7 calendar days.</p>\n<h2>8. Common situations</h2>\n<h3>&#8220;I typed the date the American way, but the family is in Australia.&#8221;</h3>\n<p>Tell us within 24 hours and we change the format. If you are unsure which format the recipient uses, writing the month as a word, such as &#8220;14 June 2025&#8221;, avoids the question entirely.</p>\n<h3>&#8220;The birth details were not final when I ordered.&#8221;</h3>\n<p>Order with the information you have and write to us inside the window. If the details will take longer than 24 hours, ask us to hold the order; we can hold it for up to 14 days without cancelling it, and the making time starts once you send the final details.</p>\n<h3>&#8220;I ordered the same frame twice by accident.&#8221;</h3>\n<p>Write to us with both order numbers and we cancel the duplicate and refund it in full.</p>\n<h3>&#8220;I want to add a second ornament for my brother.&#8221;</h3>\n<p>Within the window, we can add it to the same order so both pieces travel together; we send a payment link for the added item. After the window, a new order is simpler and still ships free.</p>\n<h3>&#8220;I would like to change the photo for a clearer one.&#8221;</h3>\n<p>Send the new file. If the original order is already made, we remake it with the better photo free of charge once, because a clearer picture is always worth it.</p>\n<h2>9. Holding an order for a later date</h2>\n<p>If you are ordering a memorial or a holiday piece early and want it made closer to the date, say so in the order notes or by email. We can hold an order for up to 14 days before making it. During a hold, changes and cancellation remain free.</p>\n<h2>10. What happens depending on when you write</h2>\n<table>\n<caption>Outcome of a change or cancellation request by timing</caption>\n<thead>\n<tr>\n<th scope=\"col\">When your request reaches us</th>\n<th scope=\"col\">Change</th>\n<th scope=\"col\">Cancellation</th>\n<th scope=\"col\">Cost to you</th>\n</tr>\n</thead>\n<tbody>\n<tr>\n<td>Within 24 hours of ordering</td>\n<td>Made before production</td>\n<td>Full refund within 7 calendar days</td>\n<td>None</td>\n</tr>\n<tr>\n<td>After 24 hours, not yet made</td>\n<td>Made before production</td>\n<td>Full refund within 7 calendar days</td>\n<td>None</td>\n</tr>\n<tr>\n<td>Made, not yet shipped</td>\n<td>Piece remade with your correction</td>\n<td>Not possible; return after delivery instead</td>\n<td>First correction free; any later cost explained first</td>\n</tr>\n<tr>\n<td>Shipped, in transit</td>\n<td>Address redirect requested from the carrier</td>\n<td>Not possible; return after delivery instead</td>\n<td>None</td>\n</tr>\n<tr>\n<td>Delivered</td>\n<td>Exchange under the returns policy</td>\n<td>Return within 60 days for a refund</td>\n<td>None; return postage is free</td>\n</tr>\n</tbody>\n</table>\n<h2>11. A short checklist before you pay</h2>\n<p>Most changes we receive are about the same few details. Reading through this list once at checkout saves you an email:</p>\n<ul>\n<li><strong>Names:</strong> check each one letter by letter, including accents, hyphens and capital letters. We print exactly what is typed.</li>\n<li><strong>Dates:</strong> decide on one format for the whole piece. Writing the month as a word avoids confusion between countries.</li>\n<li><strong>Photo:</strong> use the original file rather than a screenshot or a photo sent through a messaging app, which are often compressed.</li>\n<li><strong>Orientation:</strong> a tall photo belongs in a portrait frame and a wide photo in a landscape frame. Our <a href=\"/size-guide/\">size guide</a> shows how each format crops.</li>\n<li><strong>Address:</strong> include the apartment or unit number and check the postal code, especially when sending to someone else.</li>\n</ul>\n<h2>12. Gift orders and several recipients</h2>\n<p>When one order contains keepsakes for several people, for example an ornament for each grandchild, a change to one piece does not affect the others. Tell us which item the change applies to by its name or position in the order. If the pieces should go to different addresses, it is easier to place one order per address; each one ships free.</p>\n<p>Each recipient can also have a different shipping speed only where checkout offers more than one method; at present every order to our four countries ships by the same free method, so every piece follows the same 8–17 business day estimate.</p>\n<p>If you are ordering on behalf of a family after a loss, and several relatives are sending details, please name one person to confirm the final text. We will check with that person before making anything, so that the piece reflects what the family agreed.</p>\n<h2>13. Orders to Canada, Australia and New Zealand</h2>\n<p>Changes and cancellations work the same way for every country. The only difference is time: because transit takes 7–14 business days, a remade piece for an overseas order arrives later than the original would have. If a date matters, mention it when you write and we will tell you honestly whether the corrected piece can still arrive in time.</p>\n<h2>14. Why we cannot edit a finished piece</h2>\n<p>Customers sometimes ask whether a single letter can be fixed on a piece that is already made. Unfortunately it cannot. A photo printed onto acrylic is cured into the surface, and an engraving removes wood that cannot be put back. Covering a mistake would look worse than the mistake itself and would not last. That is why we remake rather than repair, and why the 24-hour window matters: it is the one point where a change costs nothing and delays nothing.</p>\n<p>For the same reason, we do not offer partial refunds as a way to keep a piece with an error. If the error was ours, the remake is free and quick. If the piece matches what was typed, you can still return it within 60 days with free return postage, or exchange it for a corrected piece as described on the returns page.</p>\n<h2>15. Questions</h2>\n<p>Write to <a href=\"mailto:support@koishine.com\">support@koishine.com</a> with your order number and a person will reply within 1 business day. You can also check the status of an order on our <a href=\"/order-tracking/\">Order Tracking</a> page or read our <a href=\"/faqs/\">frequently asked questions</a>.</p>\n","visible_characters":10160,"meta_description":"Change a name, date or photo, or cancel a Koishine order, free within 24 hours of ordering. What can still change after that, and how refunds work.","parent":null,"published_at":"2026-10-22T11:23:09+00:00","updated_at":"2026-10-22T11:23:09+00:00"}}